Skip to content
Snippets Groups Projects
Commit 56aa9b9e authored by Russell Bryant's avatar Russell Bryant
Browse files

Fix up a problem that was introduced into the scheduler when it was converted

to use doubly linked lists.  The schedule() function had an optimization that
had it try to guess which direction would be better for the traversal to insert
the task into the scheduler queue.  However, if the code chose the path where
it traversed the queue in reverse, and the result was that the task should be
at the head of the queue, then the code would actually put it at the tail,
instead.

(Problem found by bbryant, debugged and fixed by bbryant and me)


git-svn-id: https://origsvn.digium.com/svn/asterisk/trunk@115537 65c4cc65-6c06-0410-ace0-fbb531ad65f3
parent decb1c40
No related branches found
No related tags found
Loading
Loading
0% Loading or .
You are about to add 0 people to the discussion. Proceed with caution.
Finish editing this message first!
Please register or to comment